Tell VeroTX what you need done.
It does the work, not just tells you what's possible.
What integration left behind
The data moves. The work waits.
Your systems already talk to each other. That was never the hard part. But you still need someone to read, compare, judge, and chase things down. That doesn't move through a pipe.
You're comparing quotes, checking the contract, chasing down the signature.
6 handoffsAgents handle all three for you. You approve only where policy requires it.
1 WorkStreamSix teams. Six handoffs. Nobody owns Monday.
6 teamsOne WorkStream. If a stage is blocked, you see it immediately.
1 ownerYou're re-keying nine fields from a 40-page contract, at quarter end.
40 pagesEvery field gets checked for you. Variances come flagged with the clause attached.
every field checkedYou approved on the two facts that were easy to get.
4 sourcesAll four assembled before the call, recorded after it.
1 decisionCompatibility
Runs on the systems you already have.
Worried about ripping out what already works? You won't have to. Your systems of record stay exactly where they are. VeroTX reads from them and writes back through governed connectors.
Plus 250 more, or compose your own in the studios.
See it in action
See the work get done.
Pick a WorkStream. Watch it run.
How it works
From request to done.
Four steps. One WorkStream. Every action audited.
Request
You submit a request. Veroli catches duplicates and routes it to the right WorkStream, automatically.
Under 5 seconds to triage
Review
We check it against your rules. VeroCortex™ reasons over your policy, budget, and history before anything moves.
Multi-model routing
Assign
Your work gets picked up. Stage-scoped agents handle it, and anything unusual gets escalated to a real person.
Agent mesh
Execute
It lands where it belongs. Writes go straight into your ERP, HRIS, and PLM through governed connectors.
Systems of record
Governance
Bounded by design.
Most agent platforms compete on how much they can do without you. We're different: we publish the line our agents won't cross.
Thresholds you set
Spend, category, delivery dates, approval tiers. Agents act inside them and escalate outside them.
Some things never post unattended
Anything touching recognised revenue is proposed, never posted. A person approves. No threshold overrides that.
Bound to the Playbook version
Every action records the Playbook version live at runtime. Last quarter's decision replays against last quarter's rules.
Procurement WorkStream: purchase requisitions (PR) consolidated into one purchase order (PO).
BY FUNCTION
The same engine. Wherever you need it first.
One Execution Ledger. Connectors pre-built or composed in the studios. Nothing new to stand up.
Sourcing to payment
Onboarding, contractors, recruiting
ECO (engineering change order), NPI (new product introduction), supply chain & kitting, QA (quality assurance)
Close, reconciliation, collections
Production Ops, plant-floor scheduling and tracking. Sales and Marketing Ops, pipeline and campaign operations.
CHANGE THE PROCESS, NOT THE CODE.
Your process will change. That's the easy part.
Thresholds get renegotiated. Approvers move. A new rule lands mid-quarter. You edit the Playbook, and every run after that follows the new version.
PLAYBOOK VERSION HISTORY
Procurement WorkStream: Intake to purchase order
Spend ceiling set at 50,000
Intake to purchase order. Edited by the procurement lead.
- Requests at or below 50,000 run on the standard approval path
- Requests above 50,000 route to the budget owner before any vendor contact
- Stage-scoped agents may draft and send an RFQ but not commit spend
Second approver required above 100,000
Intake to purchase order. Edited by the controller.
- Requests above 100,000 need a second named approver before the PR is created
- The second approval is recorded with the evidence package presented at the time
Legal review added for first-time vendors
Intake to purchase order. Edited by the procurement lead.
- A vendor with no prior record adds a legal review stage before contract signature
- The WorkStream pauses at that stage until a person clears it
Illustrative version history for a Playbook configured on VeroTX.
Who edits it
The person who owns the process, not an engineer
What it costs
A config change, not a release cycle
What breaks
Nothing in flight. Runs finish on the version they started
Deployment
Deploy where your systems live.
Your cloud or ours. No proprietary data format, and no requirement to move anything you would rather keep inside your own boundary.
Managed by VeroTX
We run it. Fastest path to a first WorkStream in production, with no infrastructure to stand up.
Fastest to production
Your own cloud account
Dedicated tenancy in your account. Your keys, your network boundary, your data residency.
Your boundary, your keys
Dedicated and isolated
Dedicated cluster with service controls for regulated environments and stricter separation requirements.
Regulated environments
By Industry
Configured for your operating model
Pre-built agents, WorkStreams, and compliance packs tuned to your industry.
Worked examples
See how a WorkStream runs.
Illustrative scenarios built on the VeroTX platform.
Stop piloting. Start shipping.
4–8 weeks to go-live. Start seeing savings in year one.